New Construction Walkthrough Checklist

A new build gives you three real chances to catch problems before closing: the pre-drywall walk, the orientation, and the final walkthrough. Each one has its own checklist.

New construction gives buyers something a resale purchase doesn't: multiple structured opportunities to inspect the home before it's finished, each catching a different category of problem. Skipping any one of them, or rushing through it, means losing a window that doesn't reopen once the next phase of construction covers it up.

The three key stages are the pre-drywall or frame walk, the orientation and systems demonstration near completion, and the final walkthrough just before closing. Each has a different purpose and a different checklist, and none of them substitutes for an independent, third-party inspection working for you rather than the builder.

Treat every walkthrough as a documentation exercise, not just a tour. Photos, written notes and a signed punch list turn a verbal impression into something you can actually hold the builder to.

Approaching a walkthrough?

Send Lori your build stage and she'll help you get ready for it.

By sending this form you agree to be contacted about your real estate question. Prefer to talk now? Call or text (512) 545-9568.

Stage one

The pre-drywall (frame) walk

This happens after framing and rough-in are complete but before insulation and drywall close up the walls — the last easy look at the home's bones.

  • Framing: check for straight walls, proper bracing, and that door and window openings match the plan.
  • Sheathing and house wrap: look for gaps, tears or improperly sealed seams that could allow water intrusion.
  • Plumbing rough-in: confirm pipe routing, supports and that fixture locations match the plan you approved.
  • Electrical rough-in: check outlet, switch and fixture locations, wire routing and panel labeling as far as it's visible.
  • HVAC ducting: look at duct routing, sizing and connections, and confirm register locations match the plan.
  • Window flashing and waterproofing: verify flashing is installed correctly around window and door openings.
  • Blocking for future fixtures: confirm blocking is in place for items like grab bars, towel bars, or wall-mounted TVs if you requested them.

Stage two

Orientation and systems demonstration

Near completion, most builders schedule an orientation where a representative walks you through the home's systems and how to operate and maintain them. Treat this as a working session, not a courtesy tour — take notes, ask questions, and don't sign off on anything you haven't actually seen demonstrated.

  • Water, gas and electrical shutoffs: locate every shutoff and confirm you understand how to operate it in an emergency.
  • Electrical panel: confirm breakers are labeled and understand what each one controls.
  • HVAC system and filters: learn the filter location and size, and how to operate the thermostat and any zoning.
  • Irrigation system: understand the zones, controller operation and where the shutoff valve is located.
  • Warranty registration: confirm your warranty paperwork is complete and you know how to submit a claim after move-in.

Stage three

The final walkthrough, room by room

Go slowly, test everything under actual use, and write down anything that isn't right — even small items.

  • Doors and hardware: open and close every door, including closets and the garage entry, checking for sticking or misalignment.
  • Drywall and paint: look across walls at an angle in good light for seams, nail pops, or uneven texture and coverage.
  • Flooring: check for gaps, scratches, uneven transitions and squeaks across every room.
  • Tile and grout: look for consistent grout lines, cracked tiles, and proper caulking at tubs, showers and countertops.
  • Cabinets and counters: open every cabinet and drawer, check alignment, and look for chips or seam issues on countertops.
  • Outlets and switches: test outlets with a charger or tester, and confirm GFCI outlets trip and reset properly in kitchens, baths and exterior locations.
  • Plumbing fixtures under load: run every faucet and shower, flush every toilet, and check for leaks under sinks while water is running.
  • Appliances: run each included appliance through at least one cycle rather than just confirming it powers on.
  • Attic access: if accessible, look for proper insulation coverage and no visible daylight or gaps.
  • Roof and gutters: view from the ground for obviously misaligned shingles, and confirm gutters and downspouts direct water away from the foundation.
  • Grading and drainage: confirm the lot slopes away from the foundation and there are no low spots pooling near the home.
  • Driveway, walkways and fencing: check for significant cracking, proper drainage and secure fence installation.
  • Landscaping: confirm sod, plantings and irrigation coverage match what was included in your contract.

Documentation

Independent inspection and the punch list

  1. 1

    Hire your own inspector

    Schedule an independent, third-party inspection at the pre-drywall stage and again before closing — someone working only for you.

  2. 2

    Document as you go

    Photograph and note every issue at each stage, with dates, rather than trying to remember everything at the end.

  3. 3

    Build a written punch list

    Compile every outstanding item from the final walkthrough into a single written list, reviewed and acknowledged by the builder.

  4. 4

    Get resolution commitments in writing

    For items that can't be completed before closing, get a specific written commitment on how and when they'll be addressed.

  5. 5

    Keep records after move-in

    Log any issue that surfaces after closing with dates and photos, and submit it through the builder's warranty process in writing.